Mooroopna has a lot of bathrooms that were last touched when the Hawks were winning premierships. Small, dark, one window, a bath nobody uses and a shower over it. They work, technically. They just do not work for the people living with them.
Here is what is actually involved in replacing one, from a builder who works across the river in Shepparton.
What we usually find in Mooroopna bathrooms
Most of the bathrooms we pull apart here fall into two groups.
Post-war weatherboard homes. Typically one bathroom, often with the toilet in a separate room, sometimes externally accessed. Floor area is tight. Waterproofing is either failing or was never there in the modern sense. Plumbing is frequently galvanised steel on its last legs.
Seventies and eighties brick veneer. A bit larger, usually with a vanity, bath and shower crammed along one wall. Pastel tiles. A fan that does nothing. These often have a laundry backing onto the bathroom, which opens up the option of borrowing space.
In both cases the useful question is not what colour the tiles should be. It is whether the layout can change.
The things that actually matter
Waterproofing
This is the single most important part of the job and the part nobody sees. A bathroom that leaks behind the tiles will quietly destroy the floor structure and the wall frame, and in a weatherboard home it can take years before anyone notices.
Waterproofing is a regulated job with a required standard. It must be done by someone licensed to do it, and it needs a compliance certificate. If a quote does not mention waterproofing, ask where it is.
What is under the floor
Older Mooroopna homes are usually timber framed on stumps. Once the old floor comes up we find out what the previous leak did. Sometimes nothing. Sometimes a joist that needs replacing.
Any honest builder allows for the possibility and tells you how it will be priced if it happens. That is what a provisional sum is for, and you should ask which items in your quote are provisional.
Moving the plumbing
Keeping the toilet, shower and vanity roughly where they are is considerably cheaper than moving them. If the layout genuinely does not work, moving them is worth it. If it mostly works, spend the money on the finishes instead.
Ventilation
Regularly overlooked and a major cause of mould in Goulburn Valley homes, where we get humid summers and cold damp winters. An exhaust fan ducted properly to outside, not just into the roof cavity, makes a real difference to how long the room lasts.
Borrowing space from the laundry
This is the most common way we make a small Mooroopna bathroom feel like a different room, and it does not require extending the house.
Where the laundry backs onto the bathroom, removing the wall between them and reconfiguring both often yields a proper separate shower, a double vanity and a European-style laundry cupboard. You keep the same footprint and the plumbing is already in the right part of the house.
It does not suit every floor plan. It is worth asking about before you settle for a like-for-like replacement.
How long it takes
A straightforward bathroom renovation keeping the existing layout generally runs three to five weeks on site. Moving plumbing, structural repairs or a layout change pushes it towards six to eight.
The sequence is demolition, rough-in plumbing and electrical, floor and wall preparation, waterproofing and its mandatory curing time, tiling, fit-off, then final plumbing and electrical. The waterproofing cure is not negotiable and cannot be rushed, which catches people out.
If it is your only bathroom, plan for that. Most people arrange to use a relative’s shower or set up a temporary option.
What drives the price
- Whether the layout changes. The biggest single factor.
- Tile size and type. Large format tiles need a flatter substrate, which means more preparation. Mosaics take far longer to lay.
- What is behind the walls. Old galvanised pipework usually wants replacing while it is open, and it is much cheaper to do then than later.
- Structural repairs. Unknown until demolition, which is why it belongs in the quote as a provisional item.
- Fittings. The same room can swing enormously on tapware, vanity and screen choices.
A Mooroopna bathroom we did
We have written up a bathroom renovation we completed in Mooroopna, taking a dated room and reworking it properly. You can read how that job went, and see more finished work in the gallery.
Common questions
Do I need a permit to renovate a bathroom?
A straight replacement within the existing footprint usually does not need a building permit, though the plumbing and waterproofing must be done by licensed trades and certified. Moving walls, altering structure or changing the room’s footprint can trigger one. We confirm what your job needs before starting.
How long before I can use it?
Three to five weeks for a straightforward job, six to eight if the layout changes or we find structural problems. Waterproofing needs its full curing time regardless of how keen everyone is.
Can you keep the existing bath?
Sometimes, if it is in good condition and staying put. Be aware that reusing one fitting while replacing everything around it can look like exactly what it is. Worth discussing on site.
Is it worth doing the laundry at the same time?
If they share a wall, usually yes. The trades are already there, the walls are already open and you avoid paying twice for the same disruption.
Do you work in Mooroopna?
Yes. We are based in Shepparton, five minutes away, and Mooroopna is part of our regular working area.
Get it looked at
If your bathroom has had its day, ring Gavin on +61 3 5822 2225 or get in touch. He will come out, tell you what the room will and will not allow, and give you a straight answer on whether the layout can change.
More on our bathroom renovations and kitchen renovations.
This article is general information only. Permit and compliance requirements vary by property and by the scope of work. Confirm what applies to your job with Greater Shepparton City Council or a registered building surveyor.